Pre and Post-Tension
Pre and post-tension structures require precise planning to safely remove reinforced concrete and tensioned cables without unexpected collapses. Many are in high-traffic areas, demanding careful sequencing to minimize disruptions and ensure structural stability throughout the process.
-
Wake Forest Baptist Health Parking Deck
Demolition of existing 300,000 SF cast-in-place parking garage in the center of North Carolina’s largest teaching hospital. The project connected to an active surgical area.
Services
Structural demolition using robots
Waste removal2023 World Demolition Awards Winner
2023 National Demolition Contract of the Year -

Blythe Parking Deck
Demolition of four-level deck directly connected to the main hospital and situated next to the maternity ward. Utilizing a Kobelco SK500 and a Volvo 480, demolition was performed from the top down, working column by column. An activity was coordinated for young patients to paint a Trifecta excavator.
Services
Structural demolition
Waste removal -

CNN Parking Deck
Select Structural Demolition of the CNN Parking Deck in Downtown, Atlanta over an active rail line. Brokk Demolition Robot was placed on multiple floors to perform precise tasks.
Services
Dismantlement
Select structural demolition -

Mingle School and Parking Garage
Performed asbestos abatement, interior gut demolition, and total demolition of the 4-story building and parking garage. Utilized high reach excavator with concrete processor, to safely demolish the building from top to bottom.
Services
Total demolition
Asbestos abatement
Interior demolition -

CMC Main
Demolished hospital buildings, parking decks, rehab centers, and an apartment over 6 years. Demolished over 500,000 SF around an active hospital, incident-free and ahead of schedule.
Services
Total demolition
Waste removal
Recycling