Manufacturing

Manufacturing facility demolition is complex, requiring careful planning to avoid disrupting production. Managing heavy equipment, reinforced structures, and potential hazards while ensuring safety and environmental compliance is critical to a smooth process.

  • Pepsi Manufacturing Plant

    Total demolition of the high profile Pepsi Bottling Plant located in close proximity to South Boulevard and the Light Rail Train. Consisted of asbestos abatement, roughly 200,000 SF of site and building demolition in order to prepare the site for new construction.

    Services
    Total demolition
    Recycling
    Asbestos abatement

  • Burts Bees Manufacturing Plant

    Burts Bees Manufacturing Plant

    Installation of dust barriers for construction and renovation work in operational facilities. Walls were custom installed to meet client needs.

    Services
    Dust barrier installation

  • Wolfspeed Plant

    Wolfspeed Plant

    Select demolition of a 1,000,000 SF manufacturing facility performed while still in operation.

    Services
    Select demolition
    Hazardous waste removal

  • Amazon Distribution Center

    Concrete cutting and demolition of 190,000 SF of cracked slab at multiple facility locations. Concrete vacuum pads on mini 18K excavators lifted cut panels to protect the remaining edges.

    Services
    Select demolition
    Waste removal

  • BMW Press Plant

    BMW Press Plant

    Removed existing exterior walls and structurally demolished multiple buildings for a large expansion of a manufacturing facility in Spartanburg, SC. Reworked loading docks and utilities for the existing facility while maintaining operations, ensuring minimal disruption to the active plant.

    Services
    Structural demolition

    Shortlisted for the 2025 World Demolition Awards

Previous
Previous

Industrial Demolition & Site Work Projects

Next
Next

Pre and Post-Tensioned Garage Demolition Projects