A Dominion Power facility located in Gormania, WV was in the process of being dismantled so that it could be relocated and reassembled in Georgia. In order for the structural steel to be dismantled, the concrete turbine deck had to be demolished. The deck consisted of 13,000sf of elevated reinforced concrete on metal decking. Care had to be take during the demolition process to not damage the supporting beams.
- 13,500sf of elevated concrete on metal decking
- 4 CMU build out control rooms
- Left structural beams intact for dismantling and re-use