In order for new construction to begin of the Durham Police Department Headquarters facility and adjacent 6 story parking garage, an entire city block required demolition and grading of the 4.5 acre site. The project consisted of installation of perimeter security fence and erosion control measures, abatement of asbestos, lead and petroleum contaminated soils as well as the total demolition of 7 buildings totaling 60,000sf and over 120,000sf of site hardscape demolition.
- 60,000sf building demolition
- 120,000sf of site demolition
- >5,500 tons of contaminated soil removal and replacement with engineered fill compacter to >98%
- Friable and Non-friable asbestos abatement\
- Lead based paint abatement
- 30,000cy of soil cut
- 12,000cd of replacement and compaction to 98%
- Backfilling of foundations
- Installation of crane pad and laydown areas