During our project at Alcoa our scope included: Decommissioning of Potlines 5-8, 56 transformers, 2,800 lf of overhead ore conveyor, 47 buildings and 37 tanks. The scope also included draining and recovery of all oils, asbestos abatement of numerous buildings, the removal and processing of over 15,000 tons of RCRA waste from 608 pots. Demolition and removal of Potline building contents for reuse of existing building by new tenants. Trifecta was able to recycle over 30,000 tons of metal including aluminum, steel, and copper.