Bank of America Stadium

Charlotte, NC

Project Description

Excavator in a sports stadium on a wooden platform with blue and white seating visible.
  • Select interior demolition of the existing office spaces and equipment rooms that were located under the lower bowls eating areas on the northwest endzone

  • Completed on a very tight schedule since the entire scope had to be executed during the NFL’s off-season

  • All demolition materials were loaded from the field side, trucks backed through the existing stadium tunnel onto the playing field, the field was protected by an interlocking pad support system