
Bank of America Stadium
Charlotte, NC
Project Description
Select interior demolition of the existing office spaces and equipment rooms that were located under the lower bowls eating areas on the northwest endzone
Completed on a very tight schedule since the entire scope had to be executed during the NFL’s off-season
All demolition materials were loaded from the field side, trucks backed through the existing stadium tunnel onto the playing field, the field was protected by an interlocking pad support system