Big Brown Power Plant
Opened in 1971, the coal-fired power plant was retired in 2018 and acquired by Commercial Liability Partners in 2020. Trifecta Services used explosives to demolish two, 400-foot-tall stacks, two, 450-megawatt generators and associated 225-foot-tall boilers. The company also prepared the site for future redevelopment by conducting a full environmental abatement of the entire property and an anticipated 40,000 tons of steel will be recycled....
Medical Education Building
Trifecta Services was contracted to demolish a high-rise building and its basement space to make way for UNC’s new Medical Education Building. Using ultra-high-reach demolition machines, Trifecta’s team safely removed the building, while successfully preserving surrounding retaining walls. The Trifecta team also remediated asbestos, mercury and PCP contaminants on site....
Kell Hall
Kell Hall, a multistory building constructed in the 1920s, was demolished by Trifecta Services to allow for a new green space at Georgia State University’s downtown Atlanta campus. In addition to using conventional wrecking modalities to ensure the safe razing of the facility in a densely populated area, Trifecta Services ensured the environmental abatement of hazardous materials on the site....
Waxhaw Mill Reno
Project consisted of a historic textile mill located in Waxhaw, NC. The mill had received many additions over the years and the client desired to expose the original architecture while transforming the project to apartments. Trifecta performed building separations and removed additions in order to expose the original mill. Additionally, approximately 28,000sf of historic brick was refreshed after Trifecta’s team utilized a chemical stripper to remove multiple layers of paint to expose the historic brick. 100,000sf of combined building demolition and renovation Asbestos abatement 28,000sf of paint removal on historic...
Morrison College Demo
After decades of neglect and vandalism, the remaining seven buildings of the historic Morristown College were purchased by the City of Morristown, TN in hopes of redeveloping the area. Trifecta was contracted by the City to complete the asbestos abatement and demolition of the buildings which included two 4 story dormitories, a gymnasium, a fire damaged 3 story administration building and dining hall, as well as a boiler house. The fire damaged structure contained asbestos and had to be demolished as RACM. At the time of completion, only the original...
Mingle School Demo
Mingle School of Real Estate served as the Charlotte Board of Realtors office and real estate school for over 40 years. Due to the ever-growing City and emerging developments, the building and site proved too valuable and was slated for demolition. Trifecta Services Company was contracted to perform the asbestos abatement and complete demolition of the 4 story building. Following the abatement and complete interior gut of the building; Trifecta utilized our high reach excavator with concrete processor, to safely demolished the building from top down. This controlled method allowed...
Durham PD Headquarters
In order for new construction to begin of the Durham Police Department Headquarters facility and adjacent 6 story parking garage, an entire city block required demolition and grading of the 4.5 acre site. The project consisted of installation of perimeter security fence and erosion control measures, abatement of asbestos, lead and petroleum contaminated soils as well as the total demolition of 7 buildings totaling 60,000sf and over 120,000sf of site hardscape demolition. 60,000sf building demolition 120,000sf of site demolition >5,500 tons of contaminated soil removal and replacement with engineered fill...
Duke Crowell Hall
120,000 sf renovation and modernization of historic Crowell building on Duke University Campus. While being one of the first buildings built on Duke’s campus, it also served as a main thorough fair for students traveling across campus. The 4 story Duke Stone construction structure required numerous exterior and interior openings in structural walls, architectural demolition, as well as complete Asbestos removal throughout the project. Limited egress made this project a challenge. Uncovered TSI under sleeper systems in half of the building, maintained schedule, manned up crews....
Apex High School
Scope included: Demolition of existing multi-story high school. 350,000sf Asbestos abatement Demo required to be complete during summer break 3 story structure, built during different periods and different types of construction ...
Alcoa Rockdale
During our project at Alcoa our scope included: Decommissioning of Potlines 5-8, 56 transformers, 2,800 lf of overhead ore conveyor, 47 buildings and 37 tanks. The scope also included draining and recovery of all oils, asbestos abatement of numerous buildings, the removal and processing of over 15,000 tons of RCRA waste from 608 pots. Demolition and removal of Potline building contents for reuse of existing building by new tenants. Trifecta was able to recycle over 30,000 tons of metal including aluminum, steel, and copper....