Over the course of a six-year project, our team undertook the challenging task of demolishing numerous hospital buildings, parking decks, rehabilitation centers, and an apartment building. Remarkably, Trifecta seamlessly navigated the intricacies of working around an operational hospital throughout the entire duration of the project. Our efforts resulted in the successful demolition of over 500,000 SF of buildings without a single incident, and the project was completed ahead of schedule. Recognizing our exceptional achievements, we were honored to receive an award from DPR/RODGERS/ATRIUM for the outstanding and timely completion of...

Demolition

Wake Forest Baptist Hospital Parking Deck

The demolition involved the removal of an existing 300,000 SF cast-in-place parking garage situated in the center of North Carolina's largest teaching hospital. As part of the project, there was a need for fiber reinforcement of the existing concrete floor, and a 14,000-pound robot was carefully placed on an elevated floor. This project was intricately connected to an active hospital surgical area. To engage and entertain young patients, an excavator was creatively painted to resemble a dinosaur. The project received recognition and was honored as the WINNER of the Urban...

Duke Data Center

This Project consisted of 350,000 SF total demolition of high-rise building and adjacent parking garage in Uptown Charlotte.  Trifecta performed abatement and hazardous waste removal.  The Building was situated in a high-traffic area, directly adjacent to the active Light Rail, requiring extensive coordination with the City to ensure demolition was performed safely and without disruption to commuter scheduling.  Trifecta salvaged equipment and provided UST/AST removal to ensure that the client's expectations and budget were met....

Big Brown Power Plant

Opened in 1971, the coal-fired power plant was retired in 2018 and acquired by Commercial Liability Partners in 2020. Trifecta Services used explosives to demolish two, 400-foot-tall stacks, two, 450-megawatt generators and associated 225-foot-tall boilers. The company also prepared the site for future redevelopment by conducting a full environmental abatement of the entire property and an anticipated 40,000 tons of steel will be recycled....

Medical Education Building

Trifecta Services was contracted to demolish a high-rise building and its basement space to make way for UNC’s new Medical Education Building. Using ultra-high-reach demolition machines, Trifecta’s team safely removed the building, while successfully preserving surrounding retaining walls. The Trifecta team also remediated asbestos, mercury and PCP contaminants on site....

Nashville Convention Center

To prepare the site for a new mixed-use space in Nashville, Trifecta Services was tapped to demolish a 200,000-square-foot convention hall in one of the busiest intersections downtown. The building, situated in a dense urban area, was taken down using conventional demolition equipment safely and without infringing on adjacent occupied buildings, including the adjoining, fully operational 35-story hotel....

Kell Hall

Kell Hall, a multistory building constructed in the 1920s, was demolished by Trifecta Services to allow for a new green space at Georgia State University’s downtown Atlanta campus. In addition to using conventional wrecking modalities to ensure the safe razing of the facility in a densely populated area, Trifecta Services ensured the environmental abatement of hazardous materials on the site....

Waxhaw Mill Reno

Project consisted of a historic textile mill located in Waxhaw, NC. The mill had received many additions over the years and the client desired to expose the original architecture while transforming the project to apartments. Trifecta performed building separations and removed additions in order to expose the original mill. Additionally, approximately 28,000sf of historic brick was refreshed after Trifecta’s team utilized a chemical stripper to remove multiple layers of paint to expose the historic brick. 100,000sf of combined building demolition and renovation Asbestos abatement 28,000sf of paint removal on historic...

VW Chattanooga Paint Shop

In preparation for production of a new vehicle line-up, facilities at a major international automotive manufacturer required renovation work to its current paint shop to add a second production line at the plant. In order to not impact current production, negative pressure dust containments were built and work was completed during plant shut down periods. Trifecta successfully demolished 4200sf of concrete slab in various levels and locations throughout the plant. Additionally, 2,000sf of an elevated mezzanine was saw cut and removed while protecting the existing floor and building to remain. ...

Ore Bridge Demolition

Removal of of 520' Ore Bridge through implosion due to it's compromised status. The Ore Bridge was suspended 120' in the air over the top of an active conveyor systems that fed iron ore to a blast furnace that had to remain operation during the entire project. 80lf of the bridge was rigged to and cut in multiple sections then lowered to the ground to ensure the conveyor would not be compromised during the blast. Remaining bridge was loaded with explosives and imploded." ...