Big Brown Power Plant
Opened in 1971, the coal-fired power plant was retired in 2018 and acquired by Commercial Liability Partners in 2020. Trifecta Services used explosives to demolish two, 400-foot-tall stacks, two, 450-megawatt generators and associated 225-foot-tall boilers. The company also prepared the site for future redevelopment by conducting a full environmental abatement of the entire property and an anticipated 40,000 tons of steel will be recycled....
Medical Education Building
Trifecta Services was contracted to demolish a high-rise building and its basement space to make way for UNC’s new Medical Education Building. Using ultra-high-reach demolition machines, Trifecta’s team safely removed the building, while successfully preserving surrounding retaining walls. The Trifecta team also remediated asbestos, mercury and PCP contaminants on site....
Nashville Convention Center
To prepare the site for a new mixed-use space in Nashville, Trifecta Services was tapped to demolish a 200,000-square-foot convention hall in one of the busiest intersections downtown. The building, situated in a dense urban area, was taken down using conventional demolition equipment safely and without infringing on adjacent occupied buildings, including the adjoining, fully operational 35-story hotel....
Kell Hall
Kell Hall, a multistory building constructed in the 1920s, was demolished by Trifecta Services to allow for a new green space at Georgia State University’s downtown Atlanta campus. In addition to using conventional wrecking modalities to ensure the safe razing of the facility in a densely populated area, Trifecta Services ensured the environmental abatement of hazardous materials on the site....
Waxhaw Mill Reno
Project consisted of a historic textile mill located in Waxhaw, NC. The mill had received many additions over the years and the client desired to expose the original architecture while transforming the project to apartments. Trifecta performed building separations and removed additions in order to expose the original mill. Additionally, approximately 28,000sf of historic brick was refreshed after Trifecta’s team utilized a chemical stripper to remove multiple layers of paint to expose the historic brick. 100,000sf of combined building demolition and renovation Asbestos abatement 28,000sf of paint removal on historic...
VW Chattanooga Paint Shop
In preparation for production of a new vehicle line-up, facilities at a major international automotive manufacturer required renovation work to its current paint shop to add a second production line at the plant. In order to not impact current production, negative pressure dust containments were built and work was completed during plant shut down periods. Trifecta successfully demolished 4200sf of concrete slab in various levels and locations throughout the plant. Additionally, 2,000sf of an elevated mezzanine was saw cut and removed while protecting the existing floor and building to remain. ...
Ore Bridge Demolition
Removal of of 520' Ore Bridge through implosion due to it's compromised status. The Ore Bridge was suspended 120' in the air over the top of an active conveyor systems that fed iron ore to a blast furnace that had to remain operation during the entire project. 80lf of the bridge was rigged to and cut in multiple sections then lowered to the ground to ensure the conveyor would not be compromised during the blast. Remaining bridge was loaded with explosives and imploded." ...
Morrison College Demo
After decades of neglect and vandalism, the remaining seven buildings of the historic Morristown College were purchased by the City of Morristown, TN in hopes of redeveloping the area. Trifecta was contracted by the City to complete the asbestos abatement and demolition of the buildings which included two 4 story dormitories, a gymnasium, a fire damaged 3 story administration building and dining hall, as well as a boiler house. The fire damaged structure contained asbestos and had to be demolished as RACM. At the time of completion, only the original...
Mingle School Demo
Mingle School of Real Estate served as the Charlotte Board of Realtors office and real estate school for over 40 years. Due to the ever-growing City and emerging developments, the building and site proved too valuable and was slated for demolition. Trifecta Services Company was contracted to perform the asbestos abatement and complete demolition of the 4 story building. Following the abatement and complete interior gut of the building; Trifecta utilized our high reach excavator with concrete processor, to safely demolished the building from top down. This controlled method allowed...
Levine Cancer Center
Trifecta Services Company performed the demolition of a 4-story, 35,000 sf building that once housed the Levine Cancer Center in Charlotte. The building was demolished using our High Reach Excavator with concrete processor as well as multiple other excavators with a variety of attachments. Unknown to anyone, the building was constructed using massive concrete footings that required deep excavation for removal. Trifecta, having come prepared with sizeable equipment was able to demolish, remove the footing and to keep the project on track and schedule....